The feasibility investigation of new initiatives in the LNG field helps companies with the development and implementation of successful ideas during the entire project life.
A integrated, multi-disciplinary team can support them from the very beginning of a project to its completion, covering not only the design but also permitting aspects.
Deliverables
Concept/feasibility studies
- Preliminary site characterization to investigate presence/absence of technical, environmental or HSE constraints that might limit or impede the initiative
- Assessment of the most suitable technical solution(s) to be adopted
- Logistics’ analysis
- Preliminary design
- Preliminary cost estimate and project schedule
Feed design
- Site characterization (metocean, seismic and geotechnical)
- Specialist studies (maneuvering, mooring)
- Process (PFDs, P&IDs, heat and material balance, equipment list)
- Mechanical and piping
- Electrical and I&C (electrical load list, power cable sizing, lighting study, lightning, I&C philosophy, Cause-Effect Matrix)
- Civil (foundations, breakwater, quay, jetty)
- Safety (including HAZID/HAZOP/SIL) and fire-fighting
- Cost estimate and project schedule
- Technical specification for EPC tender package.
Why RINA?
RINA has decades of experience in design and design review of LNG terminals.
We have been involved in more than 100 projects regarding LNG (providing concept and feasibility studies, design, PMC and other specialist studies or consultancy services).