Highway and Roadway Engineering

RINA North America: delivering cost-effective and safe transportation infrastructure solutions

RINA North America highway and roadway engineering

Our expertise

Toll authorities, local agencies, and state departments of transportation across the nation count on RINA for transportation infrastructure services from initial planning through construction close-out. Our services include the planning and design of roads, highways, bridges, and interchanges in rural, urban, and mass transit environments.

RINA understands that meeting community objectives, adhering to required standards, and improving safety are key concerns of any transportation project. By partnering with our clients to design projects that are right-sized for current and future needs, and with laser focus on quality, safety, and lifecycle costs, RINA provides our clients with comprehensive solutions that stand the test of time.

 

Our disciplines

RINA North America highway and roadway engineering
  • Corridor Studies & NEPA Documentation
  • Traffic & Transportation Planning
  • Preliminary Engineering & Feasibility Studies (Alternatives Analysis)
  • Intersection & Roadway Design
  • Highway & Interchange Design
  • Drainage Design & Permitting
  • Maintenance of Traffic & Construction Sequencing
  • Public Involvement
  • Constructability & Value Engineering
  • Pedestrian Trail Planning & Design
  • Context Sensitive Solutions (CSS)
  • Funding Applications
  • Project & Program Management
  • Owner’s Representative Services
  • Scheduling, Estimating & Risk Management

Our projects

Illinois Department of Transportation (IDOT) | I-80 – Ridge Road to US Highway 30

The I-80 Phase I Preliminary Engineering and Environmental Study provided a detailed look at the current and future transportation needs of the corridor.

The study included an analysis of existing roadway and bridge deficiencies, safety and capacity issues, and future transportation needs, and included an extensive public involvement process.

As part of a joint venture team, we were selected by the Illinois Department of Transportation (IDOT) to provided preliminary and final design engineering, as well as environmental services for the improvement of I-80 from Ridge Road to U.S. Route 30, a length of approximately 16-miles.

The study addressed near-term rehabilitation improvements to the roadway and bridges, as well as investigated long-range improvements for the future of this important intercontinental expressway.

The improvements provide additional travel lanes within the median area.

Additionally, we investigated more than 40 structures as part of the project, including the major twin truss bridges that carry I-80 over the Des Plaines River.

A key planning tool was a public involvement program based upon the principles of IDOT’s Context Sensitive Solutions (CSS). Public outreach meetings, public workshops, and stakeholder meetings brought the public into the project development process early on. Corridor Advisory Group, Technical Task Force, and Corridor Interest Group meetings facilitated the coordination with the stakeholders.

Illinois Department of Transportation (IDOT) | IL Route 31, IL Route 176 to IL Route 120

Illinois Tollway | Veterans Memorial Tollway (I-355) Rehabilitation

The Veterans Memorial Tollway (I-355) is a major north-south tollway in central DuPage County, carrying approximately 268,000 vehicles per day.

Furthering its commitment to timely maintenance of roadways and bridges, the Illinois Tollway selected our company to inspect and develop rehabilitation plans for I-355 between Butterfield Road and Army Trail Road, a distance of approximately 7.5 miles.

One major design challenge was how best to maintain traffic without causing congestion and delays for daily commuters. To maintain operations, we developed traffic shifts and work zone configurations allowing the Tollway to maintain all lanes during peak travel times.

As part of this project, we inspected and designed 25 bridges (including one railroad bridge over I-355), retaining walls, and overhead cantilever sign structures within this corridor. Lighting, drainage, and noise abatement wall upgrades were also included.

Under an accelerated design schedule, we delivered project design a year early to meet the Illinois Tollway’s needs.

Illinois Tollway | Veterans Memorial Tollway (I-355) Rehabilitation

Illinois Department of Transportation (IDOT) | IL Route 31, IL Route 176 to IL Route 120

The IL Route 31 corridor improvements extend approximately eight miles through Crystal Lake and McHenry, from IL Route 176 to IL Route 120. 

We are preparing Phase II contract plans for reconstruction of the roadway from a two-lane undivided cross-section to two lanes in each direction with a median. The work also includes traffic signal installations, a continuous shared-use path and sidewalk, roadway lighting, curb and gutter, storm sewer improvements, and extensive right-of-way coordination involving more than 200 parcels. 

Structural components include a bridge replacement, numerous retaining walls, and a new longitudinal culvert along the corridor. The project also requires environmental mitigation, including tree replacements and stream relocation, as well as permitting for impacts to jurisdictional wetlands. 

Because of the corridor length and complexity, the work is being evaluated for staging in multiple construction contracts.

Illinois Department of Transportation (IDOT) | IL Route 31, IL Route 176 to IL Route 120

Will County Division of Transportation | Francis Road, Gougar Road to I-80

For Francis Road from Gougar Road to I-80, we completed a Phase I engineering and environmental study for a 0.86-mile segment in the Village of New Lenox and City of Joliet.

The project advances the reconstruction and widening of Francis Road from a two-lane rural roadway with open drainage to a three-lane rural cross-section, including a right-turn merge lane at Silver Cross Boulevard for future use as a relocated right-turn lane.

Our scope included roadway geometrics, intersection design studies, safety and crash analyses, drainage studies, environmental assessment, subsurface investigation, pavement design, retaining wall evaluation, detour design, and construction recommendations.

Several alignment shifts were investigated along tangent and curved sections of the corridor to minimize impacts to adjacent properties. We also evaluated retaining walls as a way to reduce private property impacts while still meeting the roadway improvement goals.

Will County Division of Transportation | Francis Road, Gougar Road to I-80

City of Evanston | Main Street

In Evanston, the Main Street improvements focused on a 0.4-mile corridor between Maple Avenue and Hinman Avenue, passing through a downtown business district and historic district. 

We developed the Phase I engineering and environmental study, prepared Phase II contract plans, and provided Phase III engineering for related water main and roadway improvements. The project included roadway and utility upgrades, improved pedestrian safety, ADA-compliant crossings and sidewalks, enhanced parking, bicycle accommodations, streetscape features, lighting, drainage, landscaping, and traffic signal improvements. 

Public involvement was central to the planning process, with two public meetings and five community advisory group meetings helping shape enhancements that supported both corridor users and nearby businesses. 

We also assisted the City in securing outside funding through the MWRD Green Infrastructure program, Invest in Cook, and the Illinois Transportation Enhancement Program by incorporating sustainable elements such as permeable pavers and improved tree plantings. 

Construction was staged to minimize disruption to businesses, with the work separated into two packages to isolate deep utility work and create greater schedule certainty. The project received a 2025 Special Achievement Award from the American Council of Engineering Companies (ACEC) of Illinois Engineering Excellence Awards. 

City of Evanston | Main Street