Bridge & Structural Design and Inspection

Protecting critical infrastructure through reliable inspection, assessment, and lifecycle planning

RINA North America bridge and structural

Our expertise

RINA provides bridge and structural inspection services that help owners understand the condition, safety, performance, and long-term needs of their critical infrastructure.

Our teams support transportation agencies, railroads, transit providers, utilities, municipalities, and private-sector clients with practical inspection, assessment, and reporting services rooted in technical expertise and real-world constructability.

With a focus on safety, accuracy, regulatory compliance, and asset longevity, RINA helps clients identify issues early, prioritize improvements, manage risk, and make informed decisions about maintenance, rehabilitation, and capital planning. 

Our disciplines

  • RINA North America bridge and structural Bridge Inspections 
  • Structure Inspections 
  • Load Ratings 
  • Condition Assessments 
  • Safety Inspections 
  • Inspection Reporting and Documentation 
  • Rail Bridge Inspections 
  • Highway Structure Inspections 
  • Retaining Wall and Specialty Structure Inspections 
  • Asset Inventory and Data Collection 
  • Field Inspection and Oversight 
  • Repair Recommendations 
  • Maintenance and Rehabilitation Planning 
  • Geospatial Data Collection and Asset Management 
  • Risk-Based Prioritization  
  • Owner’s Representative Support 

Our projects

Texas Department of Transportation (TxDOT) | Routine Bridge Inspections

Across Texas, routine bridge inspection assignments required field evaluation of more than 400 structures representing a wide range of bridge and culvert types. 

We inspected timber bridges, multi-cell culverts, concrete box beam structures, steel multi-girder bridges, pan girders, steel culverts, railroad flat car bridges, trusses, and prestressed AASHTO I-girder bridges. 

The work supported TxDOT’s ongoing statewide bridge inspection program by documenting existing conditions and helping maintain reliable inspection data for structures in varied settings throughout the state. 

Texas Department of Transportation (TxDOT) | Routine Bridge Inspections

Ohio Department of Transportation (ODOT) | Various Statewide Municipal Bridge Inspection

For the Ohio Department of Transportation (ODOT), we were selected for the 2023 Municipal Bridge Inspection SP02 contract covering Districts 4, 11, and 12. 

The assignment included routine and fracture critical inspections, load ratings, scour assessments, structure inventory, SNBI implementation review, and plan research for approximately 430 bridges in municipalities across the three districts. 

Our project manager coordinated daily task order activities, managed three subconsultants, maintained the inspection schedule, reviewed reports, and worked closely with ODOT and municipal representatives. 

We also served as lead team leader on more than 150 bridges, performed and reviewed load ratings, reviewed design and rehabilitation plans, and helped train newer employees in bridge inspection techniques. 

Ohio Department of Transportation (ODOT) | Various Statewide Municipal Bridge Inspection

Ohio Department of Transportation (ODOT) | VAR D12 Bridge Inspections

As a subconsultant to J.B. Fay Company, we were selected to replace the existing Louisville & Indiana Railroad (LIRC) bridge located in Columbus, Indiana at milepost 40.19.

The replacement bridge was constructed under a Design-Build delivery method and involved the accelerated replacement of LIRC’s bridge over the Flatrock River.

This project was funded by and designed to CSX Standards, with us serving as the Engineer of Record.

The existing bridge was 508-feet long and comprised of seven 30-foot steel deck span girders and two 144-foot-long steel through truss spans and was partially submerged during 100-year storm events. The replacement structure is comprised of eight 30-foot concrete approach spans; one 115-foot ballasted deck through plate girder (TPG); five 34-foot approach spans. The substructure consists of concrete caps founded on two drilled shafts.

A single 96-hour continuous outage was planned for the superstructure change out; during which time the existing bridge would be demolished and the TPG bridge was rolled into place.

We worked with a contractor to develop an initial project concept; incorporating innovative planning/design details throughout the final design, enabling J.B Fay to replace the entire structure and raise the track profile 5-feet, in just 48-hours.

Ohio Department of Transportation (ODOT) | VAR D12 Bridge Inspections